Lokring Install

PipeServ was asked for a recommendation on how to safely connect a 2” gas service steel line to a newly constructed 3” PE pipeline. With the range of products and services offered by PipeServ, we were able to recommend the installation using both Lokring pipe fittings and Supertech steel to PE transition fittings.  A 3” transition fitting was supplied with a 3×2 reducer (welded, tested and certified) and this was then installed using a Lokring 2” pipe coupling. With the 2” steel line shut-in; it was cold-cut and the installation completed using the Lokring coupling. No on-site welding, flushing or purging was required and the installation completed within two hours.